Skip to content

When Will Your Warwick Council Home Get a New Kitchen or Boiler?

A draft policy sets out how long Warwick District Council expects kitchens, bathrooms, boilers and windows to last in its homes, and promises tenants a month's notice of major works.

Three-storey red-brick council flats on Lyttelton Road in Warwick, with balconies, a path and mown grass in front
Council flats on Lyttelton Road, Warwick, June 2022. The council's reports do not name individual blocks. Photo: Robin Stott, CC BY-SA 2.0

Warwick District Council has set out how long it expects the parts of its council homes to last, which gives tenants a rough idea of when a new kitchen, bathroom or boiler should be due. The figures are in a new draft Cyclical and Planned Maintenance Policy, which went to the council’s Housing Scrutiny Committee on Tuesday 3 November.

On this page
  1. How long Warwick council home fittings are expected to last
  2. What else the policy promises Warwick tenants
  3. Why it matters

Councillors were asked to endorse it ahead of a Cabinet decision this month. The report says the point is to let tenants know how and when improvements to their homes will be planned.

How long Warwick council home fittings are expected to last

Part of the homeExpected life
Kitchen20 years
Bathroom30 years
Boiler15 years
Shower10 years
Windows30 years
Front and back doors30 years
Electrical rewire30 years
Carbon monoxide detector10 years
Loft insulation25 years
Lift (in blocks with one)25 years

These aren’t dates tenants can hold the council to. The clock starts when the item was installed, but the draft says a judgement of its actual condition takes priority, so a kitchen in good order could stay longer and one in poor condition could go sooner. Work can also be brought forward to deal with a case under Awaab’s Law, where that gives a long-term fix or costs less.

What else the policy promises Warwick tenants

  • At least a month’s notice of major works, with information and options for vulnerable tenants where possible.
  • A survey of each home at least every five years, with about a fifth of homes surveyed each year, mostly by the council’s own team.
  • Outside walls and communal areas redecorated every five to seven years.
  • A target of at least 70% of the maintenance budget going on planned rather than emergency work.

The report says money for this work, and for getting every home to at least an EPC rating of C by 2030, is already in the housing business plan from February, mostly from the major repairs reserve and borrowing. It adds that residents asked to see the five-year investment plan when they were consulted. That plan is still to be updated.

Why it matters

The council referred itself to the Regulator of Social Housing and expects an inspection during 2027. The report calls this policy a fundamental part of the service that is currently missing. It doesn’t cover everyday repairs, which have their own policy: we reported this week on the overdue repairs backlog and fire safety work in council flats.

Know more about this, or got another story? Send us a story, a photo or a press release. We read everything.

Alex Harrington